FREE SHIPPING ON ORDERS OVER $30
Athearn Genesis G65203 HO Scale SD60E (Juniata Shops Rebuild) Norfolk Southern NS #6952Roadnumber Specific Details for #6906, #6939, and #6952: NS built 4000 gallon fuel tank Roof mounted sinclair antennasNS designed snow plowDifferent cab panel louver arr
Roadnumber Specific Details for #6906, #6939, and #6952:
Model Features:
Prototype Information: Beginning in early 2010, NS 6653 entered Juniata shop for 240 units planned through 2019. In August 2010, two SD60s
(6567 and 6576) were retired and ear-marked for the SD60E
program. Mechanically, the original prime mover, a 16-cylinder
710G3 model remained, but it was thoroughly rebuilt to 710G3B
specs and rerated to 4,000 horsepower. The original shaftdriven
air compressor was replaced with a new motor-driven
compressor. All-new electrical cabinets and wiring, coupled with
EMDs EM2000 microprocessor controls, were installed, along
with D99BTR traction motors. A new split-cooling system helps
the SD60E meet Tier 0+ emissions requirements and reduce
fuel consumption by an estimated 5 percent as compared to
an older SD60 model. The SD60Es tractive effort is rated at
109,000 pounds unrebuilt SD60s are rated at 96,320-100,000
pounds.
Externally while most of the SD60s carbody remained intact
during the remanufacturing process, the program included
installation of a completely new cab. Offering crews more
protection the original SD60 cab weighs 3,800 pounds versus
12,500 pounds for the new cab as well as a spacious work
environment, the cab 59 square feet versus 74 square feet
in the SD60E was designed by NS with input from outside
consultants and train crews. Fabricated by Curry Railroad
Supply, a local vendor, it looks unlike anything else on U.S. rails
with its pronounced numberboard/headlight housing and flat
front with a centered cab door.
The first unit was finally released for service on November 15,
2010, carrying road number 6900. In March 2011, 6901 was
released, followed by 6902 in June of that year. These three
units gave NS mechanical personnel valuable feedback as the
units toured the system, enduring real life testing.
In March 2012, the fourth SD60E emerged from Juniata as one
of the 12 units initially funded for the program. But the pace of the
remanufacturing process picked up as initial teething problems
were addressed. The units soon met the carriers expectations
and began entering revenue service on a regular basis.
(From: Diesel Era Vol. 25 #5 Sept/Oct 2014)
Standard Shipping
Cost: $25
Free Shipping
We offer free shipping on orders over $30. Please check the free - shipping eligibility at checkout.
Delivery Time:
It usually takes [3-5] business days for standard shipping. Please note that this is an estimated time frame and may be affected by local holidays, and unforeseen circumstances.
Reviews
There are no reviews yet.